workbench sitting in workshop

Make the perfect DIY workbench, cabinet, work table or shop cart for your workshop. The new Rock-Steady workshop stands feature strong heavy-gauge steel construction and pre-drilled holes for easy assembly and accessorizing. These are the best steel cabinet frames in the business.

Mix and match different size shop stand legs and stretchers to suit your needs. Choose from one of our complete kits or select individual shop stand components and accessories. Our Rock-Steady Shop Stand Configurator makes it easy to design and shop for the perfect DIY cabinet frame.

Scroll Down for Free Tool Stand Project Plans



Video: Learn More About Designing the Perfect Shop Stand



Rockler Rock-Steady Shop Stand Kits

All Rockler Rock-Steady Shop Stands feature four stretchers with a generous top lip to support both a top and a shelf, and the legs are studded with holes spaced 32mm on center. These accept our optional Drawer/Shelf Brackets and Hinge Brackets (both sold separately), which let you mount shelves and drawers with Euro hinges. They also accept our optional Steel Pegboard Panels. The top stretchers can be mounted lower if you wish to add a vise or a top drawer to the stand.

32x20x32 shop stand frame

The 32''W x 20''D x 32''H Rock-Steady Shop Stand kit is the perfect size for any of the Rockler 28'' x 40'' tops, leaving a 4'' overhang on all sides for easy clamping. Use it as a spacious assembly table, a CNC stand, or pair it with our T-Track table for a versatile clamping workbench. If you need a smaller footprint, the 20"W x 16"D x 32"H Rock-Steady Shop Stand kit is the right size for the Small T-Track Tabletop (#57680, sold separately). It leaves a generous overhang around the edge for clamping, while still providing plenty of stability. The size is also a great fit for smaller power tools like a CNC Piranha, bench grinder or sharpening station.


shop stand kits

Rockler has many more Rock Steady Stand Kits to choose from, including the examples above, plus more.



Design Your Own Rock-Steady Shop Stand

shop stand sizes

Mix-and-match shop stand components to build a shop stand in any size you need. Our Rock-Steady Shop Stand Configurator makes it easy to select the correct size components for your custom-size workshop stand.



SHOP STAND PROJECT PLANS

Download this Turning Tool Sharpening Cart Plan

turning wool sharpening work table

Video: Take a Closer Look at this Sharpening Cart



Download this Large Work Table Plan

large shop stand work table project plan download button


Download this Drill Press Shop Stand Plan

drill press on a shop stand with casters


Download this Thickness Planer Work Station Plan

planer cart download button


Download this Benchtop Table Saw Work Station Plan

table saw work station plan download button


Download the Router Table Cabinet Drawer Plan


router table two drawer plan download button


Download Miter Saw Stand Plans


miter saw stand plan download


Download the Deluxe Router Table Cabinet Plan


router table cabinet plan download button