Sofa Table Project Plan
I like working and eating while sitting on my sofa, but I don’t have a stable table surface that slide up close for my computer or food. So, making a solid and stable sofa table (you could also call it a TV tray) has been on my project list for a long time.
Project design and plan by Alex from Bevelish Creations.


Use the Rockler Taper / Straight Line Jig to safely and accurately cut the tapered top and bottom leg support parts..

The leg support parts are assembled with dowels. Use the Rockler Doweling Jig to accurately bore the dowel holes in the top, bottom and vertical leg support parts..

Layout the holes necessary for the Heavy-Duty Cross Dowels and Bolts in the leg support assemblies and stretchers. Then the Rockler Heavy-Duty Cross Dowel Drilling Jig to accurately bore the holes for the cross dowel hardware..
VIDEO: How to Install Heavy-Duty Cross Dowels and Bolts Using the Rockler Cross Dowel Drilling Jig

Insert the Heavy-Duty Cross Dowels and Bolts to connect the leg assemblies and stretchers. Tighten the hardware with a wrench..
This project was designed and built by Alex from Bevelish Creations. You can find more of Alex's work at:
www.bevelishcreations.com.

Keep the inspiration coming!